Competitors are asked to think freely and creatively, while at the same time respecting project boundaries and adjacent land uses. Designs should be of an urban in quality, world-class, yet reflecting traditional uses of outdoor space in Ho Chi Minh City and Vietnam. Most significantly, the three Competition elements - plaza, park, and bridge - must be designed as a unified composition with related and overlapping uses, functional circulation, creating a unified public space design for Thu Thiem

 

Central Plaza


  • The general grade of the Central Plaza is +2.5m at the western end, +5.0m at the Crescent Boulevard, and +2.5m at the eastern end adjacent to the Central Lake.
  • The Central Plaza area is made up of eight (8) distinct open space blocks.
  • The roadways between the blocks must be maintained and accommodated. Underpasses and/or overpasses for these roads are strongly discouraged.
  • One transit station for underground subway must be incorporated into the Central Plaza, with the location determined by the Competitors.
  • Underground parking and other underground uses may be proposed. Competitors should explain the ideas programmatically as well as functionally (access, dimension, etc.).

 

Crescent Park

  • The general grade of the Crescent Park is assumed to be +2.0m along the river and +2.5m at the roadway.
  • The Crescent Park should incorporate active and passive uses. The quantity and type of playfields, courts, and/or other elements are to be determined by the Competitiors.
  • An urban promenade along the rivers edge should be incorporated.
  • A ferry and water taxi stop should be incorported where the Central Plaza meets the Crescent Park. A ferry and water taxi stop will be located on the western bank of the Saigon River (location to be determined by HCMC).
  • The Crescent Park should be able to accommodate thousands during large events and festivals.

 

 

 

 

 

 

 

 

 

 

Saigon River Pedestrian Bridge

  • The general grade on either side of the Saigon River where the bridge will begin/end is +2.0m.
  • The bridge is intended for both pedestrians and bicyclists, with overlooks for viewing.
  • The vertical clearance of the bridge from high tide elevation + is 10m.
  • The span of bridge that needs to maintain the vertical clearance is 80m.
  • Structural supports may be located within the Saigon River.